[Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestone business project of Kampot Cement Co., Ltd.
Published by: Open Development Cambodia
Data Resources (1)
Data Resource Preview - [Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestones business project in Kampot province.
Additional Info
Field | Value |
---|---|
Geographic area (spatial range) |
|
Topics |
|
Document type | Environmental Impact Assessment |
Contracting Parties |
|
Government Entity (multiple) |
|
Concession/License name | Kampot Cement Co., LTD (KCC) |
License | Creative Commons Attribution Share-Alike |
Copyright | No |
Access and use constraints |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use. |
Version / Edition | 1 |
Language of document |
|
Province(s) |
|
Metadata Reference Information |
Metadata last updated on 2018-08-03. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net |
Signature date | December 28, 2017 |
Contact |
SBK Research and Development Co., Ltd. No.43 St.317 corner 572 Sangkat Beong Kak Ti Pir Khan Tuol Kouk , Phnom Penh |
Granted area | 343.75 |
Contract term | 5.0 |
Contract term unit | Years |
Payment for concession fees | Year1: 400/year Year 2: 800/year Year 3: 1000/year |
Payment for concession fees unit | $/ha |
Party's obligation in the implementation of the project |
Kampot Cement Limestone Mining follows the modern Semi-Open Cut method, cutting from the center of the mountain and from top to bottom over an area of more than 343.75 hectares with a height of 10 meters, which takes 80 years to operate. Silo Oxide (SiO2) Limestone Excavation Site After clearing, site preparation, installation of the production line machinery, construction of the site structure, and access road construction, the company will plan for daily operations for quarrying limestone in 4 main stages, such as drilling & blasting, loading & hauling, crushing, and stocking. |
Job creation summary |
The company will need 212 direct workers for key jobs such as transportation, drilling, infrastructure, rock blasting, pre-mountain patrol, metering, and rock quality inspection. |
Number of created jobs | 212.0 |
Training summary |
All project staff will be trained to understand environmental-social issues and to understand their role under the company's environmental-social management plan. The training will ensure that each employee is well aware of his or her duties in carrying out his / her work with a high regard for environmental and occupational safety issues. |
Fund allocation for training | 1000.0 |
Environmental protection obligation |
An environmental management plan will be drawn up every six months, outlining data on the amount of solids, liquids, particles, sound, vibration, and control measures and facilities submitted to the Ministry of Environment for review. If necessary, the environmental management plan will be updated or revised to include issues of urgency, randomness, inspection, monitoring, and audit. |
Socio-cultural protection |
The company cooperates with local authorities to educate and guide employees to respect and love each other's cultural and religious traditions, especially the beliefs of local people. The company has measures to reduce the vibration that affects the temple and the artifacts in the temple, as specified in the point of sound and vibration. The company has identified a number of measures to restore and include. As for local life, For example, the company will repair damaged and noisy roads due to project activities. Clean all fluids and liquids from the construction site before closing the project in collaboration with the Provincial Department of Environment and the Provincial Department of Mines and Energy. |
Total amount of social fund | 2000.0 |
Environmental fund summary |
The company has prepared a budget of USD 3,000/year for the first five years. The budget package is divided into two parts. The first phase, USD 1,000/year, is to help improve local environmental standards through education and promotion campaigns on solid waste storage and tree planting. Section 2 supports the headquarters of Meat Say village, roads, pagodas, and caves. |
Total amount of environmental funds | 1000.0 |
Legacy reference document | Draft_ESIA_Kampot_Cement__28.12.2017.pdf |
Keywords | limestone construction,Environmental and Social Impact Assessment (ESIA),Kampot Cement |
Open Contracting Identifier | ocds-miumsd-6f4baa82-05a6-423b-ab48-e503144091dd |
Date uploaded | August 12, 2024, 03:59 (UTC) |
Date modified | January 30, 2025, 02:09 (UTC) |