Environmental and social management framework for the Cambodia Southeast Asia Disaster Risk Management Project II (KH-SEADRM II)
This Environmental and Social Management Framework establishes the procedures and requirements for identifying, assessing, managing, and monitoring potential environmental and s...
-
Environmental and social management plan for the TK2 Bridge construction site, Tboung Khmum province (KH-SEADRM II)
This site-specific Environmental and Social Management Plan was prepared for the construction of the TK2 Bridge (PK9+726) in Tuol Khlong village, Preah Theat commune, Ou Reang O...
-
Environmental and social management plan for the Saeb DBST and reinforced concrete road subproject, Kampong Chhnang province (WRR1 – Lot 2)
This Environmental and Social Management Plan assesses the potential environmental and social impacts of upgrading a 5.744-kilometre existing laterite road in Saeb commune, Kamp...
-
Environmental and social management plan for the Chi Phoch–Chres DBST and reinforced concrete rural road subproject, Prey Veng province (WRR1 – Lot 3)
This Environmental and Social Management Plan (ESMP) assesses the potential environmental and social impacts of upgrading an existing 10.679-kilometre laterite road to a combina...
-
Environmental and social management plan for the Tramung–Choam Ta Mau DBST and reinforced concrete rural road subproject, Tboung Khmum province (WRR1 – Lot 4)
This Environmental and Social Management Plan (ESMP) assesses the potential environmental and social impacts of upgrading an existing 10.278-kilometre laterite road to a combina...
-
Environmental and social management plan for the Tuek Chenh–Srae Sar DBST rural road subproject, Kampong Chhnang province (WRR1 – Lot 1)
This Environmental and Social Management Plan (ESMP) assesses the potential environmental and social impacts of upgrading an existing 11.085-kilometre laterite road to a double ...
-
Environmental and social management planning framework for the National Restoration of Rural Productive Capacity Project (NRRPCP)
This framework establishes the principles, procedures, and institutional responsibilities for identifying, assessing, managing, and monitoring the environmental and social impac...
-
Environmental and social management planning framework for the National Rural Roads and Productivity Improvement Project (NRRPCP)
This framework establishes the environmental and social safeguards procedures for the National Rural Roads and Productivity Improvement Project (NRRPCP), implemented by the Mini...
-
Environmental and social management plan and two environmental codes of practice for Package 1 subprojects (MRD–CASDP)
This compilation contains one Environmental and Social Management Plan (ESMP) and two Environmental and Social Codes of Practice (ESCOPs) prepared under the Cambodia Agricultura...
-
Environmental and social management plan for the Tuek Chenh–Ou Dounta Kraom DBST rural road subproject, Pailin province (WRR3 – Lot 6)
This Environmental and Social Management Plan (ESMP) was prepared for the WRR3 Lot 6 subproject to rehabilitate an existing 20.85-kilometre laterite road into a double bituminou...
-
Environmental and social management plan for the Boeng Praev–Chrouy Svay DBST and reinforced concrete road subproject (WRR3 – Lot 7)
This document presents the Environmental and Social Management Plan (ESMP) for the WRR3 Lot 7 rural road subproject connecting Boeng Praev and Chrouy Svay. The plan addresses po...
-
Environmental and social management plan for the Kouk Banteay–Kang Meas DBST and reinforced concrete road subproject, Kampong Chhnang province (WRR3 – Lot 1)
This Environmental and Social Management Plan (ESMP) was prepared for the WRR3 Lot 1 subproject to upgrade the rural road connecting Kouk Banteay and Kang Meas in Rolea Bier dis...
-
Environmental and social management plan for the Chi Peang–Krasang DBST rural road subproject, Tbong Khmum province (WRR3 – Lot 5)
This document presents the environmental and social management plan for the WRR3 Lot 5 rural road subproject in Tbong Khmum province. It addresses potential environmental and so...
-
Environmental and social management plan for the National Road No. 5–Kouk Kruos DBST rural road subproject, Kampong Chhnang province (WRR3 – Lot 2)
This document presents the environmental and social management plan for the WRR3 Lot 2 rural road subproject connecting National Road No. 5 to Kouk Kruos in Kampong Chhnang prov...
-
Environmental and social management plan for the Thma Totueng–Sampov Lun DBST rural road subproject, Tbong Khmum province (WRR3 – Lot 4)
This document presents the environmental and social management plan for upgrading an existing 11.684-kilometre laterite road into a double bituminous surface treatment (DBST) ro...
-
Environmental and social management plan for the Kansoam Ak–Chrak Svay DBST rural road subproject, Prey Veng province (WRR3 – Lot 3)
This document presents the environmental and social management plan for the Kansoam Ak–Chrak Svay rural road subproject under WRR3 Lot 3 in Prey Veng province. It addresses pote...
-
Environmental and social management plan for the NR No. 5 Tbaeng Mean Chey DBST rural road subproject (WRR4 – Lot 5)
This document presents the environmental and social management plan for the WRR4 Lot 5 rural road subproject associated with National Road No. 5 in the Tbaeng Mean Chey area. It...
-
Revised environmental and social management plan for the WWA2 Lot 1 rural road subproject, Kampong Chhnang province
This document presents the revised environmental and social management plan for the WWA2 Lot 1 rural road subproject in Kampong Chhnang province. It provides a framework for ide...
-
Revised environmental and social management plan for the WWA2 Lot 2 rural road subproject, Prey Veng province
This document presents the revised environmental and social management plan for the WWA2 Lot 2 rural road subproject in Prey Veng province. It provides a framework for identifyi...
-
Revised environmental and social management plan for the WWA2 Lot 3 rural road subproject, Tbong Khmum province
This document presents the revised environmental and social management plan for the WWA2 Lot 3 rural road subproject in Tbong Khmum province. It provides a framework for identif...