Skip to content

Environmental and social management plan for the Saeb DBST and reinforced concrete road subproject, Kampong Chhnang province (WRR1 – Lot 2)

This Environmental and Social Management Plan assesses the potential environmental and social impacts of upgrading a 5.744-kilometre existing laterite road in Saeb commune, Kampong Tralach district, Kampong Chhnang province, into a road with double bituminous surface treatment (DBST) and reinforced concrete sections. It identifies construction-related risks, including dust, noise, waste, traffic disruption, and temporary impacts on roadside market stalls, and sets out mitigation measures, environmental and social monitoring arrangements, public consultation procedures, and a grievance redress mechanism.

Data Resources (1)

Data Resource Preview - Environmental and social management plan for the Saeb DBST and reinforced concrete road subproject, Kampong Chhnang province (WRR1 – Lot 2)

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Topics
  • Environmental impact assessments
  • Infrastructure
Geographic area (spatial range)
  • Cambodia
Copyright To be determined
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Version / Edition 1
License

No license given

Contact

Ministry of Rural Development (MRD) Address: No. 771–773, Preah Monivong Boulevard (Street 93), Sangkat Boeung Trabek, Khan Chamkar Mon, Phnom Penh, Cambodia. Telephone: +855 12 669 535 Email: info@mrd.gov.kh Website: www.mrd.gov.kh

Author (corporate) Ministry of Rural Development (MRD)
Publication date 2022
Legacy reference document esmp_saeb_dbst_reinforced_concrete_road_kampong_chhnang__06.2022.pdf
Keywords Environmental and social management,Rural road rehabilitation,Grievance redress mechanism,Construction impact mitigation
Date uploaded November 15, 2026, 07:37 (UTC)
Date modified November 15, 2026, 07:37 (UTC)