Skip to content

[Draft] Initial environmental and social impact assessment (IESIA) on sand mining to create ship route and fill Kampot Special Economic Zone and Port project

พิมพ์โดย: Open Development Cambodia

The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.

ทรัพยากรข้อมูล (16)

ตัวอย่างทรัพยากรข้อมูล - Table of Content

ข้อมูลเพิ่มเติม

ฟิลด์ ค่า
พื้นที่ทางภูมิศาสตร์ (ช่วงข้อมูล)
  • กัมพูชา
หัวข้อเรื่อง
  • Environmental impact assessments
  • Mining
  • Special economic zones
ประเภทเอกสาร Environmental Impact Assessment
ภาคีคู่สัญญา
  • Kampot SEZ
หน่วยงานของรัฐ (หลายแห่ง)
  • Ministry of Environment
  • Ministry of Land Management, Urban Planning and Construction
  • Ministry of Mines and Energy
  • Ministry of Water Resources and Meterology
ใบอนุญาต Creative Commons Attribution Share-Alike
ลิขสิทธิ์ No
ข้อจำกัดการเข้าถึงและใช้งาน

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

เวอร์ชั่น / รุ่น 1
ภาษาของเอกสาร
  • ภาษาเขมร
จังหวัด
  • Kampot
ข้อมูลอ้างอิงข้อมูลเมตา

Metadata last updated on 2021-07-07. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

วันที่ลงนาม 10 เมษายน ค.ศ. 2010
ข้อมูลติดต่อ

CES CO., LTD Address: Phnom Penh, Cambodia. Phone: (855) 12 666 462 Email: info@ces.com.kh

บทสรุปการสร้างงาน

In this project, the company needs about 100 local workers and about 300 foreign workers.

จำนวนตำแหน่งงานสร้าง 400.0
บทสรุปงานอบรม

The company has educational programs for its employees and workers to understand environmental pollution and environmental beauty, such as: - Education on solid and liquid waste management: be careful when spilling or storing oil and pour waste only in designated containers. - Water pollution education: how to use machinery and equipment in a technical manner according to the location and time.

Environmental protection obligation

The general process of environmental management planning in the project area includes: - Data collection and analysis by the project owner or project consultant - Preparation of monthly, quarterly and annual reports made by the project owner or project consultant - Receipt of reports and implementation of inspections and suggestions for reports by the Ministry or Department of Environment and relevant institutions.

สรุปกองทุนสิ่งแวดล้อม

The company plans to contribute to environmental resource restoration activities such as replanting mangrove trees in suitable locations, improving the quality of natural seagrass and natural grass planting, restoring coral planting systems in suitable locations, and conserving spawning grounds.

จำนวนเงินกองทุนสิ่งแวดล้อมทั้งหมด 3000000.0
เอกสารอ้างอิงเดิม Draft_IESIA_Kamport_Port__10.04.2021.pdf
คำสำคัญ International Port,IEIA,Kampot Port,Kampot SEZ
ตัวบ่งชี้การทำสัญญาเปิด ocds-miumsd-810cfa5c-314b-4b5c-bbb5-676fed97fe03
วันที่อัพโหลด กรกฎาคม 9, 2021, 06:59 (UTC)
แก้ไขเมื่อ ตุลาคม 5, 2022, 08:32 (UTC)