Skip to content

Letters from theMEKONG TIME FOR A NEW NARRATIVE ON MEKONG HYDROPOWER

พิมพ์โดย: Village Focus International

This issue brief – the second in Stimson’s “Letters from the Mekong” series – examines the current status of mitigation efforts at Laos’ Xayaburi and Don Sahong dam projects and the relevance of the existing narrative surrounding hydropower development on the river’s mainstream. Based on extensive research on the status and expected impacts of these projects, the authors of this brief have concluded that the current narrative of inev-itability surrounding the future of the Mekong is increasingly at odds with what is in fact a very fluid situation. Instead of being the first two of up to nine or eleven mainstream “dominos” to fall, these commercial-opportunity projects are likely to face significantly increasing political and financial risks and uncertainties.

ทรัพยากรข้อมูล (1)

ตัวอย่างทรัพยากรข้อมูล - etters from theMEKONG TIME FOR A NEW NARRATIVE ON MEKONG HYDROPOWER

ข้อมูลเพิ่มเติม

ฟิลด์ ค่า
ประเภทเอกสาร Reports, journal articles, and research papers (including theses and dissertations)
ภาษาของเอกสาร
  • ภาษาอังกฤษ
หัวข้อเรื่อง Hydropower dams
พื้นที่ทางภูมิศาสตร์ (ช่วงข้อมูล)
  • ลาว
จังหวัด
  • Xayabouly
ลิขสิทธิ์ Unclear copyright
ข้อจำกัดการเข้าถึงและการใช้งาน

No known access and use constraints at the time of uploading

เวอร์ชั่น / รุ่น 1
ใบอนุญาต unspecified
ข้อมูลติดต่อ

1211 Connecticut Avenue NW, 8th FloorWashington, DC 20036Tel: 202.223.5956 | Fax: 202.238.9604www.stimson.org

ผู้แต่ง (บุคคล) Stimson Center
สถานที่พิมพ์ Laos
สำนักพิมพ์ Stimson Center.
วันที่พิมพ์ 2015
จำนวนหน้า 40
วันที่อัพโหลด พฤษภาคม 18, 2018, 10:57 (UTC)
แก้ไขเมื่อ พฤษภาคม 22, 2018, 03:33 (UTC)