Skip to content

Sambor Hydropower Dam Alternatives Assessment, Final Report

พิมพ์โดย: Open Development Cambodia

The Sambor Hydropower Dam Alternatives Assessment was conducted by an international team of experts directed by the Natural Heritage Institute (NHI) under a formal agreement (Memorandum of Understanding) with the Ministry of Mines and Energy of the Royal Government of Cambodia (RGC), executed on October 20, 2014. The MoU charged the NHI Team to assess siting, design and operational alternatives to the originally proposed Sambor Hydropower Dam on the mainstream of the Mekong River and also a no-dam alternative for power generation. The 2600 MW project would be the largest hydropower dam constructed on the Lower Mekong and it would create a complete barrier to migratory fish that are a valuable source of protein and income to people in Cambodia, and block sediment that replenishes the Mekong Delta and nourishes the food chain of the Tonle Sap Great Lake. This exacerbates climate change impacts, such as sea-level rise, and reduces the region’s ability to build resiliency. NHI’s Sambor Alternatives Assessment developed a set of environmental performance standards (e.g. max fish survival and sediment passage) selected to maintain the natural functions of the Mekong river system, and then considered how a major hydropower facility could be sited, designed and operated to achieve those standards while maximizing power production and maintaining economic viability.

The process behind and the key findings of the Sambor Alternatives Assessment are presented in the attached resources along with the full reports for download.

ทรัพยากรข้อมูล (5)

ตัวอย่างทรัพยากรข้อมูล - Key Findings of NHI’s Sambor Hydropower Dam Alternatives Assessment (2018)

ข้อมูลเพิ่มเติม

ฟิลด์ ค่า
ประเภทเอกสาร Reports, journal articles, and research papers (including theses and dissertations)
ภาษาของเอกสาร
  • ภาษาอังกฤษ
หัวข้อเรื่อง
  • Climate change
  • Hydropower dams
  • Renewable energy production
  • Wild capture commercial fishing and natural fisheries
พื้นที่ทางภูมิศาสตร์ (ช่วงข้อมูล)
  • กัมพูชา
จังหวัด
  • Kratie
  • Stung Treng
ลิขสิทธิ์ No
ข้อจำกัดการเข้าถึงและการใช้งาน

No known access and use constraints. Documents were provided for open access.

เวอร์ชั่น / รุ่น 1.0
ใบอนุญาต unspecified
ข้อมูลติดต่อ

Natural Heritage Institute 236 Morningside Drive Corte Madera, California 94925, USA Email gat@n-h-i.org www.n-h-i.org

ผู้แต่ง (หน่วยงาน) National Heritage Institute
สถานที่พิมพ์ USA
สำนักพิมพ์ National Heritage Institute
วันที่พิมพ์ 2017
จำนวนหน้า 74
คำสำคัญ Sambor dam
วันที่อัพโหลด พฤษภาคม 19, 2018, 11:37 (UTC)
แก้ไขเมื่อ พฤษภาคม 20, 2018, 03:58 (UTC)