-
Environmental Impact Assessment on Diversion Route Lower Yuam Reservoir -- Bhumibol Reservoir: Executive Summary Report
Under the Feasibility Study: Environmental Impact Assessment, Public Relations and Public Hearing of the Bhumibol Reservoir Inflow Augmentation Project, Panya Consultants Co.,...
-
[Draft] Environmental and Social Impact Assessment (ESIA) Stung Pursat 1 hydroelectric project (80MV) in Veal Veng district Pursat province (BOT)
KTC Cable was registered in Seoul, South Korea on August 2005 and focus on electric and optical wire production for all telecommunication network. In 2006 this company received...
-
[Draft] Environmental and social impact assessment (ESIA) on Kamchay Hydroelectric Project in Kampot Province of SINOHYDRO KAMCHAY HYDROELECTRIC CO., LTD.
SINOHYDRO is one of the leading companies in the world in saving and conserving water resources for electricity generation. The project will construct two hydropower dams across...
-
[Draft] Initial environmental and social impact assessment : Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company won the international...
-
[Draft] Initial environmental and social impact assessment on Cheay Areng hydropower project in Koh Kong province
China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According...
-
[Draft] Environmental and social impact assessment: Tatay hydroelectric project in Koh Kong province, Cambodia
The Tatay hydroelectric project of Koh Kong province was invested by Chinese company name Cambodian Tatay Hydropower Limited (CTHL) amounting USD 540 million and covering an...
-
[Draft] Environmental impact assessment for feasibility study of Lower Sesan 2 hydropower project, Stung Treng province, Cambodia
The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and...
-
[Draft] Environmental impact assessment for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The length of the main dam is 8km with crest 83m above the sea level and 40m above the river. The Lower Sesan II is located in Sesan district, Stung Treng province, Cambodia...
-
[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess...
-
[Draft] Environmental and social impact assessment: Stung Atay hydro-electric BOT project in Veal Veng district, Pursat province
C.H.D is one of the largest Chinese companies in the world working on saving and conserving water resources to generate electricity. The company will develop the hydroelectric...
-
[Draft] Initial Environmental and Social Impact Assessment (IESIA) on Atay hydropower project in Veal Veng district Pursat project
The Stung Atay Hydropower Development Project was signed between the Royal Government and China Yunan Corporation for International Techchno-Economic Cooperation (CYC) on...
-
SN Power_ESIA of Middle Yeywa Hydropower Project
This Environmental and Social Impact Assessment Report (ESIA) is prepared by a combined team of international and national experts on behalf of SN Power, for the Middle Yeywa...
-
Environmental and social impact assessment: Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company invests in...
You can also access this registry using the API (see คู่มือ API).