Skip to content

[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia

พิมพ์โดย: Open Development Cambodia

The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess of demand. The project also responds to the Rectangular Strategy of the Third Mandate Government, which deals with the development of the energy sector to meet the demand for low-cost electricity. Another important purpose is to ensure that energy generation and its positive impact on the nation are carefully weighed against the negative environmental and social impacts it will cause, especially on the upstream area. Downstream and upstream of the project area.

ทรัพยากรข้อมูล (23)

ตัวอย่างทรัพยากรข้อมูล - Table of Content

ข้อมูลเพิ่มเติม

ฟิลด์ ค่า
พื้นที่ทางภูมิศาสตร์ (ช่วงข้อมูล)
  • กัมพูชา
หัวข้อเรื่อง
  • Environmental impact assessments
  • Hydropower dams
ประเภทเอกสาร Environmental Impact Assessment
ภาคีคู่สัญญา
  • Electricity of Vietnam
หน่วยงานของรัฐ (หลายแห่ง)
  • Ministry of Mines and Energy
ชื่อใบอนุญาต/สัมปทาน Lower Sesan II Hydropower Project
ใบอนุญาต

No license given

ลิขสิทธิ์ Unclear copyright
ข้อจำกัดการเข้าถึงและใช้งาน

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

เวอร์ชั่น / รุ่น 1
ภาษาของเอกสาร
  • ภาษาเขมร
จังหวัด
  • Stung Treng
ข้อมูลอ้างอิงข้อมูลเมตา

Metadata last updated on 08.09.2022. For inquiries contact: Open Development Cambodia

Address: #23B, Street 606, Sangkat Boeng Kak Ti Pir, Khan Tuol Kouk Phnom Penh, Cambodia 12152. Email: contact@opendevcam.net Website: http://www.opendevcam.net

ข้อมูลติดต่อ

Vietnam Electricity

Address: Km9+2000, Nguyen Trai, Thanh Xuan, Hanoi, Vietnam Tel: (84) 042148006 Fax: (84) 048541208

เงื่อนไขสัญญา 30.0
ข้อผูกพันของภาคีในการดำเนินโครงการ

The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of ​​Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded.

บทสรุปการสร้างงาน

Employment for community workers / people from 2010 to 2014 with a total of approximately 9,500​.

จำนวนตำแหน่งงานสร้าง 9500.0
Environmental protection obligation

The Environmental Management Plan (EMP) provides a guide for monitoring and mitigation measures for pre-construction, post-construction and project operation. EMPs include institutional summaries, mitigation measures, and monitoring programs. Mitigation measures and monitoring programs will include analysis of responsible institutions and budgets.

การคุ้มครองทางสังคมและวัฒนธรรม

Positive impacts on the environment and society include: -Electricity: 400 MW turbine and total power 1953.9 GWh -Rural Infrastructure: The project will build a new road to the bypass and bridge project area on the east side of the Sesan River to connect the resettlement area of ​​Srekor village and Khsach Thmey village. The project also builds all community facilities in the resettlement area, including community schools, pagodas, roads, and wells, to a number and standards equivalent to or better than what will be destroyed in the village, which will be flooded. -Employment: Employment for community workers / people from 2010 to 2014 with a total of approximately 9,500 -Tourism: Natural resources in and around the lake, infrastructure projects and visits to hydropower plants, fishing -Revenue: Selling local products, tourism activities, construction contractors -Economy: Develop Cambodia's infrastructure, including industry / handicraft, agriculture and tourism in the region, paying taxes to the Royal Government of Cambodia through investment law contracts.

โครงการที่เกี่ยวข้อง

Lower Sesan 2៖ https://data.opendevelopmentcambodia.net/km/dataset/hydropower-2009-2014/resource/4e6d2d95-80e3-4459-ae09-1b9214746c59/detail?map_id=

เอกสารอ้างอิงเดิม Copy_EIA_Lower_Sesan2_Hydropower__00.09.2009.pdf
คำสำคัญ Lower Sesan2 Hydropower dam,Vietnam Electricity,EIA
ตัวบ่งชี้การทำสัญญาเปิด ocds-miumsd-1d1cc12b-4571-47ef-a211-d13e4cde6ac1
วันที่อัพโหลด กันยายน 8, 2022, 03:47 (UTC)
แก้ไขเมื่อ ตุลาคม 5, 2022, 07:02 (UTC)